This forum is in read-only mode for archive purposes, please use our new forum at https://community.justflight.com
Forum Home Forum Home > Just Chat > Just Chat - General Discussion
  New Posts New Posts RSS Feed - LHC scheduled for 2009 restart
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

LHC scheduled for 2009 restart

 Post Reply Post Reply
Author
Message
Odai View Drop Down
Chief Pilot
Chief Pilot
Avatar

Joined: 05 Apr 2008
Location: NW England
Points: 3731
Post Options Post Options   Thanks (0) Thanks(0)   Quote Odai Quote  Post ReplyReply Direct Link To This Post Topic: LHC scheduled for 2009 restart
    Posted: 28 Sep 2008 at 8:43pm
"LHC re-start scheduled for 2009

Geneva, 23 September 2008. Investigations at CERN following a large helium leak into sector 3-4 of the Large Hadron Collider (LHC) tunnel have indicated that the most likely cause of the incident was a faulty electrical connection between two of the accelerator’s magnets. Before a full understanding of the incident can be established, however, the sector has to be brought to room temperature and the magnets involved opened up for inspection. This will take three to four weeks. Full details of this investigation will be made available once it is complete.

“Coming immediately after the very successful start of LHC operation on 10 September, this is undoubtedly a psychological blow,” said CERN Director General Robert Aymar. “Nevertheless, the success of the LHC’s first operation with beam is testimony to years of painstaking preparation and the skill of the teams involved in building and running CERN’s accelerator complex. I have no doubt that we will overcome this setback with same degree of rigour and application.”

The time necessary for the investigation and repairs precludes a restart before CERN’s obligatory winter maintenance period, bringing the date for restart of the accelerator complex to early spring 2009. LHC beams will then follow.

Particle accelerators such as the LHC are unique machines, built at the cutting edge of technology. Each is its own prototype, and teething troubles at the start-up phase are therefore always possible.

“The LHC is a very complex instrument, huge in scale and pushing technological limits in many areas,” said Peter Limon, who was responsible for commissioning the world’s first large-scale superconducting accelerator, the Tevatron at Fermilab in the USA. “Events occur from time to time that temporarily stop operations, for shorter or longer periods, especially during the early phases.”

CERN has received similar words of support from several laboratories, including Germany’s DESY, home of the HERA superconducting particle accelerator, which ran from 1992 to 2007."
ʎɐqǝ uo pɹɐoqʎǝʞ ɐ ʎnq ı ǝɯıʇ ʇsɐן ǝɥʇ sı sıɥʇ
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down